Highway Construction – Oakajee Project – May 2025

We were engaged by Highway Construction to trench and install 1.2kms of 100mm Subsurface Drainage and Rip Raps along the batters on the side of the new highway to alleviate the subsurface water pushing up from the sub-base under the road.

This was a challenging job as we had a specific time frame to complete, and the use of a specialized Rock cutting machine as the soil profile was predominantly a hard rock.